Why This Meeting Is Unmissable for You

The decisions made during engineering and design ultimately determine project cost, schedule and constructability.

Advancing Nuclear Power Construction brings together engineers, owners, constructors and reactor developers to align on practical, scalable deployment models.

Why It's Worth Taking Time Out

The industry's standardisation decisions are being made today.

This is the opportunity to engage directly with the organisations delivering projects and ensure engineering decisions support efficient construction.

Engineering & Design

The Challenges You'll Solve

1 - Nuclear Power

Improving Design Maturity

2 - Nuclear Power

Reducing Scope Changes During Delivery

3 - Nuclear Power

Enabling Standardisation

4 - Nuclear Power

Designing For Modular Construction

5 - Nuclear Power

Supporting A Design-One-Build-Many Future

Key Sessions Recommended For You

"Design One, Build Many" Approach

Conference Day Two

Practical Takeaway: Leave knowing where design standardization can realistically start given today’s crowded field, and how a design-one-build-many approach, rather than bespoke delivery, is what actually unlocks lower cost and schedule.

Speakers:

Russell Milam

Modularizing the Build - Case Study

Conference Day Two

Practical Takeaway: Leave with a practical test for when modular actually beats stick-built for a given scope, and how to size modules to the real transport and lift constraints of a site rather than to an idealized plan.

Speakers:

Adam Garcia

Learnings From Vogtle, Olkiluoto & Barakah

Conference Day Two

Practical Takeaway: Leave with the specific delivery and standardization decisions that separated the on-time international builds from the multi-billion-dollar overruns, and a clear view of which lessons realistically transfer to a US first fleet.

Speakers:

Sean Burk

Connect With The Full Supply Chain

Meet decision-makers from companies such as:

  • Nuclear owners including Constellation, NextEra Energy, and SaskPower.
  • EPC leaders including Fluor and Burns & McDonnell.
  • Reactor developers including X-Energy.
  • Engineering peers from Arcadis, Black & Veatch, and PPI Quality & Engineering.
  • Construction partners including Fessler & Bowman, Ace Electric, and Pan-Pacific Mechanical to improve constructability and project execution alignment.
Ace Electric
Arcadis
Logo of Black & Veatch, an attending company at Advancing Nuclear Power Construction 2027
Logo of Burns & McDonnell, an attending company at Advancing Nuclear Power Construction 2027
Logo of Constellation, an attending company at Advancing Nuclear Power Construction 2027
Logo of Fessler & Bowman, an attending company at Advancing Nuclear Power Construction 2027
Logo of Fluor, an attending company at Advancing Nuclear Power Construction 2027
NextEra Energy
Pan-Pacific Mechanical
Logo of PPI Quality & Engineering, an attending company at Advancing Nuclear Power Construction 2027
Logo of SaskPower, an attending company at Advancing Nuclear Power Construction 2027
Logo of X-energy, an attending company at Advancing Nuclear Power Construction 2027
advancing-data-center-construction-midwest-image-2-768x432 (1)

Explore the Agenda

See how the first US nuclear fleet actually gets built across a pre-conference workshop day and two conference days of case studies, panels, and interactive sessions. 

advancing-data-center-construction-midwest-image-9-768x432-1 (1)

Partner With Us

Position your brand alongside the owners, EPCs, contractors, and engineers making the critical decisions on the first wave of US nuclear projects. 

advancing-data-center-construction-midwest-image-11-768x432-1 (1)

Join the Teams Building the Next Fleet

Make critical connections with the owners, developers, EPCs, contractors, and engineers delivering new nuclear, with 40% of the agenda dedicated to networking.