7:30 am Registration & Networking Breakfast
8:20 am Chair’s Opening Remarks
Sizing the Challenge: Demand Rich, Delivery Poor
8:30 am Opening Panel: Demand Rich, Delivery Poor: Can the Industry Actually Build What It Has Promised?
- Facing the real question head on: not how big the opportunity is, but whether the industry can actually deliver it
- Sizing the gap between roughly 100 large, 400 SMR, and thousands of micro reactors and today’s delivery capacity
- Setting up the delivery challenge, across supply chain, workforce and licensing, that the rest of the programme exists to solve
Practical Takeaway: Leave with an honest, cross-industry read on whether the fleet can actually be built, and a sharp sense of the delivery gap that every session over the next two days is designed to help you close.
9:15 am Case Study: Restarting Duane Arnold: Delivery Lessons from a Second US Plant Restart
- Walking the Duane Arnold restart: refurbishment scope, NRC re-authorization and the milestones to a targeted 2029 return to service
- Comparing a BWR restart with the Crane case just heard, and what actually transfers between restart projects
- Re-mobilizing the workforce, supply chain and long-lead parts, and how a data-center PPA and DOE loan underpin the build
Practical Takeaway: Leave with a second, side-by-side restart case: the refurbishment, licensing and financing moves that bring a shut-down plant back, and which of them repeat across restarts.
9:45 am Morning Refreshments & Networking
Delivering the First Projects: Turning Restarts and First Builds into Repeatable Wins
11:15 am Headline Case Study: Restarting Three Mile Island as Crane Clean Energy Center: Delivery Lessons from a Live Restart
- Adding 835 MW of clean, reliable energy, with Constellation hitting its restart strategic-plan milestones roughly a year ahead of schedule
- Walking the Crane restart project milestones and the hard-won learnings coming straight out of hot functional testing
- Running a portfolio of around 25 concurrent major projects and 27,000 total activities, from cooling towers to control-room upgrades, and the work-order engine behind them
Practical Takeaway: Leave with a live, current view of how an operating utility actually plans and sequences a first-of-its-kind restart at scale, and the hot-functional and milestone learnings that transfer directly to new build.
11:45 am Case Study: Building the AP1000 Fleet: Turning the One Proven Large Reactor into a Repeatable Build
- Reading why the US government and utilities have converged on the AP1000 as the only proven, operating large reactor to scale, the target is 20 AP1000s, not 20 “units”
- Turning Vogtle’s hard-won lessons and Westinghouse’s re-certified NRC design into a repeatable, lower-risk build rather than another cost overrun
- Fixing the real killer, design maturity, so modular construction is not undone by midbuild design change
Practical Takeaway: Leave knowing why the AP1000 is the near-term backbone of the US large-reactor build, and exactly what design maturity and delivery discipline it takes to make the next units repeatable rather than a repeat of Vogtle.
12:15 pm Presentation: Rebuilding the N-stamp and NQA-1 Vendor Base
- Walking the practical qualification pathway that brings lapsed fabricators back to N-stamp
- Widening the pool fast, using inherent-safety and simpler SMR designs to lower the bar
- Sharing audits and qualification data across owners and EPCs to cut the cost and time to qualify
Practical Takeaway: Leave with practical qualification pathways, not just a description of the shortage: how to re-qualify lapsed fabricators, widen the pool, and use shared audits to get more vendors nuclear-ready faster.
12:45 pm Networking Lunch
Planning, Estimating & De-Risking Delivery
1:45 pm Presentation: Getting Preconstruction Right: Planning the First Build Before You Break Ground
- Front-loading the constructability, site logistics and long-lead decisions that quietly set the whole schedule
- Building the preconstruction estimate and execution plan that a first-of-a-kind nuclear scope actually needs
- Getting specialty trades engaged early so nuclear QA and site readiness are solved before mobilization
Practical Takeaway: Leave with a preconstruction checklist for a first nuclear build: the constructability, logistics and early-engagement moves that prevent the expensive surprises once you are on site.
2:15 pm Co-Presentation: Advanced Work Packaging and Project Controls for a First-of-a-Kind Build
- Standing up Advanced Work Packaging so engineering, procurement and construction pull from one connected plan
- Building the project controls, schedule and progress metrics that keep a first-of-a-kind build honest
- Sequencing installation work packages so the craft always has a complete, ready front of work
Practical Takeaway: Leave with a practical AWP and project-controls blueprint that keeps engineering, procurement and the field working from one plan, so a first build runs to schedule instead of discovering problems at the workface.
2:45 pm Presentation: Estimating, Scheduling and Structuring the First Nuclear Build
- Building a credible estimate, man-hour basis and one true schedule for a first-of-akind build, between constructor and reactor developer
- Sequencing the limited pre-LTC work you can start before the full licence-to-construct lands
- Structuring EPC versus EPCM and where delivery risk should sit as new entrants and hyperscalers move into nuclear
Practical Takeaway: Leave with a practical basis for costing, scheduling and structuring a first nuclear build, and a clear view of how delivery and risk models need to evolve for first-of-a-kind projects.
3:15 pm Afternoon Refreshments & Networking
3:45 pm Interactive Roundtable: Solving the Delivery Roadblocks Across Every Discipline
- Working in discipline groups to put proven fixes on the table, not just name the roadblocks
- Swapping what has actually worked across EPC, GC, MEP, engineering and owner teams
- Leaving with a shared set of fixes you can take straight back to your own project
Practical Takeaway: Leave with a bank of proven, cross-discipline fixes you can apply immediately, not just a list of problems, having traded solutions with the teams that hit the same walls.
4:15 pm Closing Keynote: The Education of a Learning Organization: Delivering on New Nuclear
- Reckoning with how much capital and regulatory cost is spent before a final investment decision, and how that reshapes decision-making
- Delivering a first build in a genuinely new nuclear jurisdiction, where a state-owned enterprise owns the failure as well as the success
- Mobilizing a supply chain to make N-stamp and nuclear-qualification investments ahead of a project that has not yet been sanctioned
Practical Takeaway: Leave with a candid owner’s view of what it really takes to stand up new nuclear from scratch: the upfront cost, the political and commercial risk, and how a learning organization builds the capability to deliver anyway.